Coming in 2023!
Harbor Club South Haven is proud to announce that it is getting ready to break ground on the construction of its new pool, spa and bath house.
The pool is 60’ x 24’, includes two lanes for lap swimming and an in water bench on the north side of the pool. The new bath house will include three family bathrooms each with a separate shower, an open locker/lobby area, an office and equipment room.
The goal is to have the new pool open by mid-summer, 2023 if all goes according to plan.
The pool is going to be constructed with gunite concrete, the most durable pool construction. There will be a large concrete deck surrounding the pool.
The pool will be available for Harbor Club owners and their guests.
Harbor Club South Haven – where desire meets reality. Contact us now to schedule a tour of your new favorite destination.